Our Smurf Blue House: a lesson watching paint dry

A few weeks back, I stopped over at the house immediately after the painters had completed the paint on the exterior of the home. This is what I saw:

IMG_1568IMG_1564

Yes, it’s smurf blue.

Papa_Smurf123

I had a small panic attack because this was absolutely not the color we had chosen. After freaking out all night and getting very little sleep, I went over to the house the next morning and this is what I saw:

IMG_1576IMG_1580

Bumble #20: Watching paint dry. I’m sure it was a combination of the time of day and duration the paint had to dry, but man, what a difference ~12 hours makes in the color of the home.

A few days before the paint went on, the garage doors were installed:

IMG_1528IMG_1531

I love color of them. They look like wood, but they’re actually a painted metal product (I’ll never have to worry about maintenance).

They also stained all of the bead board ceilings and beam work on the outside:

IMG_1608IMG_1607

Here’s the front porch. We plan to stain the front doors to match the darker color of the beams.

IMG_1605IMG_1606

And here’s a view of the rear porch.

Moving inside all of the granite has been installed:

IMG_1527

I think the rectangular sinks really set the granite off in our master bath.

IMG_1519

Here’s a shot of the one of the two vanities in the jack and jill bath.

IMG_1518

The guest bath (they forgot the sink at the time of install).

IMG_1517

Here’s the powder room vanity DIY project. I love how they curved the front of the granite to match the curve of the vanity. They still need to install a vessel sink on top which will come in a few weeks.

IMG_1526

The butler’s pantry turned out awesome with the chiseled edge front. I can’t wait to see this area with lights on above it.

IMG_1522IMG_1525IMG_1523IMG_1521

And finally the kitchen. The receptacle box in the middle of the island is going to have subway tile wrapped around the sides with another piece of granite installed on top. The subway tile will also serve as the backsplash on long perimeter wall.

The painters have also been busy inside. Here’s a couple of shots to give you a flavor of the work that’s been completed so far:

IMG_1771IMG_1773

The first shot shows the keeping room with board and batten trim and the second photo shows the wainscoting in the mud room.

We stopped in this morning and they were starting the railings for the stairs:

IMG_1770

I think the big newel posts are going to look amazing when they’re all stained up.

Moving back outside, the metal roof and gutters have been installed and the driveway and sidewalk are prepped for concrete:

IMG_1774

They should pour the concrete tomorrow (sorry for the crappy photo).

Our builder has committed to having the house completed by Halloween, although we hope we can move in a few days before to be able to hand out candy to the neighborhood kids. It’s crazy to think that one month from now we’ll be living in this home.

This week the hardwoods will be installed. They need about 2 days to install them, 1 day to sand, and another 2 days for staining/polying the floor, so there will be virtually no other progress on the inside until they finish up. Once that’s done, all of the trades (i.e., electricians, plumbers, and painters) will come back to do the finish work on the homes.

Our builder expects to get our certificate of occupancy by mid-month…fingers crossed for a better inspector than last time!

Advertisements

One thought on “Our Smurf Blue House: a lesson watching paint dry

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s